08/22/2017 13:28:29
Shayna Chabner McKinney
Caltech's students are playing a critical role in the decision making around Caltech’s newest undergraduate residence, now under construction.
08/11/2017 14:09:39
Jon Nalick
The ATM formerly located at Winnett is now running at its new location on the west side of Chandler.
A workman helps finish the installation of an ATM on the west side of Chandler.
07/27/2017 16:31:07
Jon Nalick
Key services previously available at Winnett have been moved.
 The ATM will remain in place until about August 11, 2017, when it will be moved to its new location south of the Red Door Marketplace.
07/20/2017 16:25:49
Jon Nalick
Caltech cut water use by 11 percent and trash generation by 5 percent in FY2016.
The annual report details the goals, successes, and challenges facing the Institute in terms of sustainability.
07/11/2017 10:02:09
Shayna Chabner McKinney
A sneak peek of design concepts and planning for the construction of the Tianqiao and Chrissy Chen Neuroscience Research Building.
 A conceptual rendering of the Tianqiao and Chrissy Chen Neuroscience Research Building with Moore Walk in the foreground.
05/05/2017 11:11:59
The Athenaeum will celebrate the grand opening of its new kitchen on May 12.
The new space, attached to the Athenaeum’s existing kitchen, doubles the club’s food-prepping square footage.
04/24/2017 09:33:46
Caltech rolls out a new Institute magazine, in print and online
Magazine cover
04/08/2017 08:34:24
North Field upgraded with new state-of-the-art artificial turf.
Following an eight-month renovation project, the North Field will soon be open for use.
02/04/2017 15:06:37
Jon Nalick
Stressed by drought, windstorms, and a systemic fungal infection, the 400-year-old Engelmann oak tree treasured by generations of Institute staff, faculty, and students has died.
The Engelmann oak as it appeared in 1965.
11/28/2016 10:30:41
BBE celebrates the restoration of a DNA sculpture.
Image of helix sculpture
Subscribe to Caltech News tagged with "facilities"